Description
A lightweight, durable, and cost-effective solution. Apply solvent cement evenly to both joint surfaces, insert the pipe fully into the socket, and wipe away any excess cement with a cloth. Allow the joint to set for five minutes before handling and leave for twelve hours before testing the system. For external installations, ABS waste systems should be protected from long-term sunlight exposure using an exterior gloss paint. Solvent-weld waste pipe must be used exclusively with solvent-weld waste fittings.






Reviews
There are no reviews yet.